fbpx

Interval Films were commissioned to provide time-lapse photography for a new site for Grainger plc, for their new build development of 88 private residential dwellings in Hortensia Road SXW London, adjacent to Clapham Common, one of South London’s finest green spaces.

For the second year running we supplied two 4k timelapse camera systems to capture the 4 day build of Screwfix Live in the Farnborough FIVE event space.

The cameras along with backup batteries were braced to existing fixtures for a clean and simple install. The batteries allow continuous operation through these fast builds even if the cameras are accidentally unplugged.

We were capturing and uploading images every 2 minutes to ensure we had enough footage for the promo which was edited and delivered overnight before the event started the following day.

Suffolk Waste to Energy – SITA UK.Multi camera time-lapse of the Suffolk Energy to Waste facility being built over the course of three years with solar powered cameras. Capturing the development and repurpose of facility.