fbpx

Lovedon Fields – HAB

Start
March 2017
Categories
Construction
House Building 
Finish
April 2019

Mar 2017 – Apr 2019

This semi-rural site on the delightfully named Lovedon Lane, sits on the edge of the historic village of Kings Worthy, just two miles from the cathedral city of Winchester. Alongside the homes, there will be sports facilities together with allotments, wildflower meadows and a village green.

 

Interval Films installed a solar powered 4K time-lapse camera atop an 8 meter tilt over tower, to capture the entire development in a single shot.

SIMILAR PROJECTS

Energy Storage – Arenko Group

Start
May 2018
Categories
Engineering
Fit Out
Finish
November 2018

May 2018 – November 2018

Interval Films provided multi-camera timelapse photography for this impressive energy storage project, developed by Arenko.

 

The project was billed as “one of the largest in the U.K. and globally, with the ability to provide affordable, on-demand power to the equivalent of approximately 100,000 UK homes.”

SIMILAR PROJECTS

Warehouse Fit Out – Private Client

Start
February 2016
Categories
Engineering
Fit Out
Finish
September 2016

Feb 2016 – Sept 2016

One of Interval Films long standing clients wanted to capture the interior fit out of a new shuttle racking system and other associated storage and logistical upgrades.

 

The warehouse was in constant use throughout the upgrade. We fitted one of our bespoke 4K timelapse cameras to a steel beam which was rotated around as the works were completed. The final film incorporated shots from several different angles.

SIMILAR PROJECTS

4 Seasons Timelapse – Private

Start
Feb 2017
Categories
Landscaping
Time-lapse
Finish
Feb 2018

Feb 2017 – Feb 2018

Not all timelapse is specifically for commercial use. Here Interval Films supplied a timelapse camera to a private client to create a year in the life of his garden.

 

This shot captures nature through the seasons, showing plant growth from its spring creation through its bloom and into the dead of winter.

SIMILAR PROJECTS

Embassy Gardens A02 – Ballymore

Start
November 2017
Categories
Construction
Engineering
Finish
March 2019

Feb 2017 – March 2019

After the success of our previous timelapse work for Ballymore  we were asked to to provide timelapse photography of their exclusive development in Nine Elms. This shot shows one of five different timelapse cameras we have had covering the project over the last four years.

 

Planning and designing the Nine Elms project benefited from the visionary thinking of one of the foremost practitioners in the industry, Sir Terry Farrell, who was given the task of masterminding the regeneration of Nine Elms.

SIMILAR PROJECTS

Emirates FA Cup Final – 2019

Start
May 2019
Categories
Events
Fast Interval
Finish
May 2019

May 2019 – May 2019

Interval Films provided multi-camera time-lapse photography for the 2019 Emirates FA Cup Final at Wembley Stadium.

 

We monitored the cameras live throughout the whole event enabling us to remotely capture at 1 second intervals to properly showcase the crowds and the game. We then edited the video ready for social media release on the same day.

SIMILAR PROJECTS

Embassy Gardens – Ballymore

Start
Feb 2016
Categories
Demolition
Construction
Finish
November 2019

Feb 2016 – Sept 2016

Interval films were commissioned by Ecoworld Ballymore to provide a time-lapse video for the Embassy Gardens build in the Nine Elms regeneration zone in London in 2016.

 

Planning and designing the Nine Elms project benefited from the visionary thinking of one of the foremost practitioners in the industry, Sir Terry Farrell, who was given the task of masterminding the regeneration of Nine Elms.

SIMILAR PROJECTS

A133 Ipswich Road Scheme – Eurovia

Start
July 2018
Categories
Construction
Roadworks
Finish
July 2019
June 2018 – June 2019

Capture of Eurovia’s road upgrade on the A133 in Colchester, Essex. A demonstration of how our solar powered timelapse cameras can be used by our clients to monitor project progress and provide updates to the local community.

 

This scheme will see the replacement of double roundabouts with a single roundabout. The carriageway between Ipswich Road and Harwich Road junctions will also be widened and a new retaining wall built along the railway lines.

SIMILAR PROJECTS

Screwfix Live – 2016

Start
Sept 2016
Categories
Events
Construction
Finish
September 2016

Sept 2016 – Sept 2016

Interval Films were appointed by Marmalade Productions to provide timelapse photography showing the set up at Screwfix LIVE 2016, for the second year running capturing the four day build of Live in the Farnborough FIVE event space.

SIMILAR PROJECTS

Crossness – Thames Water

Start
February 2011
Categories
Construction
Engineering
Finish
November 2012

Feb 2011 – Nov 2012

We built, installed, and managed a timelapse camera capturing the extensive upgrades to the Crossness Sewage Treatment Plant in East London. This was a white-labled service and our bespoke camera system was installed on the side of a sludge incinerator at a height of 80 ft and it performed flawlessly throughout the 2 years of construction.

 

Crossness Sewage Treatment Works in East London which is one of the largest treatment works in the UK, serving approximately two million people. The £145m upgrade project forms part of Thames Water’s London Tideway Improvements programme, which comprises major engineering schemes to improve water quality in the River Thames.

SIMILAR PROJECTS